This standard specifies the planning, construction and operation of pumping stations that ensure the permanent or temporary discharge from flowing or standing surface waters that temporarily or permanently lack a natural discharge. A distinction is made between permanent pumping stations and flood pumping stations. Permanent pumping stations convey the entire discharge from an area that has no natural receiving water. Floodwater pumping stations only pump during periods when the natural receiving water is insufficient. This standard does not apply to sewage pumping stations, sludge pumping stations, pumping stations for water extraction or supply and the like.
Begin
2024-08-26
Planned document number
DIN 1184
Project number
11905013
Responsible national committee
NA 119-02-10 AA - Pumping station
previous edition(s)
Pumping stations; archimedian screw pumps; directives for planning
1992-03
Pumping stations; centrifugal pumps for operation without screen; directives for planning
1992-03
Order from DIN Media
Pumping stations; centrifugal pumps for operation with screen; directives for planning
1992-03
Order from DIN Media
Pumping stations; design, construction and operation