• Hydrogen Technologies Standards form the basic framework for market ramp-up

    More information
Project

Fire protection - Automatic sprinkler systems - Part 2: Requirements and test methods for sprinkler system alarm valves, check valves, water motor alarms, retard devices and accelerators

Begin

2023-09-12

Planned document number

ISO/FDIS 6182-2

Responsible national committee

NA 031-03-03 AA - Water extinguishing systems and components  

Responsible international committee

ISO/TC 21/SC 5/WG 10 - Valves  

draft standard

Fire protection - Automatic sprinkler systems - Part 2: Requirements and test methods for sprinkler system alarm valves, check valves, water motor alarms, retard devices and accelerators
2024-03
Order from DIN Media

Fire protection - Automatic sprinkler systems - Part 2: Requirements and test methods for sprinkler system alarm valves, check valves, water motor alarms, retard devices and accelerators
2025-04
Order from DIN Media

previous edition(s)

Fire protection - Automatic sprinkler systems - Part 8: Requirements and test methods for pre-action dry alarm valves
2019-05

Order from DIN Media

Fire protection - Automatic sprinkler systems - Part 6: Requirements and test methods for check valves
2020-03

Order from DIN Media

Fire protection - Automatic sprinkler systems - Part 5: Requirements and test methods for deluge valves
2012-12

Order from DIN Media

Fire protection - Automatic sprinkler systems - Part 4: Requirements and test methods for quick opening devices
2019-03

Order from DIN Media

Fire protection - Automatic sprinkler systems - Part 3: Requirements and test methods for dry pipe valves
2012-12

Order from DIN Media

Fire protection - Automatic sprinkler systems - Part 2: Requirements and test methods for wet alarm valves, retard chambers and water motor alarms
2012-12

Order from DIN Media

Contact

Bastian Krämer

Am DIN-Platz, Burggrafenstr. 6
10787 Berlin

Tel.: +49 30 2601-2917
Fax: +49 30 2601-42917

Send message to contact