Shell Boilers - Part 6: Requirements for equipment for the boiler; German version EN 12953-6:2024
Abstract
This document specifies the minimum requirements for safety related equipment for shell boilers (generator and/or assemblies) as specified in EN 12953-1:2012, to ensure the boiler operates within the allowable limits (pressure, temperature, etc.) and if the limits are exceeded the energy supply shall be automatically interrupted and locked out, irrespective of the degree of intervention. NOTE 1 For this European Standard, the term "boiler" is applicable for generator and/or assemblies. NOTE 2 The maximum time of operation without manual (human) intervention can be specified for each boiler system. NOTE 3 Annex C (informative) gives recommendations of operation and testing of the boiler system with a maximum time of operation without manual (human) intervention of 24 hours and 72 hours.
Begin
2021-11-23
WI
00269067
Planned document number
DIN EN 12953-6
Project number
08201439
Responsible national committee
NA 082-00-18 AA - Boiler plants
Responsible european committee
CEN/TC 269/WG 2 - Shell boilers
draft standard
Shell boilers - Part 6: Requirements for equipment for the boiler; German and English version prEN 12953-6:2023
2023-07
Order from DIN Media
previous edition(s)
Shell boilers - Part 6: Requirements for equipment for the boiler; German version EN 12953-6:2011
2011-05