Execution of special geotechnical work — Sheet pile walls, combined pile walls, high modulus walls; German version EN 12063:2024
Abstract
This document specifies requirements, recommendations and information concerning the execution of permanent or temporary sheet pile walls, combined pile walls, high modulus wall structures and the handling of equipment and materials. This document does not give requirements and recommendations for the installation of specific parts of the structure such as ground anchorages, displacement piles and micropiles which are covered by other documents. This document is applicable to steel sheet pile walls, combined walls, high modulus walls, synthetic sheet pile walls (composite), precast concrete sheet pile walls and timber sheet pile walls. Tubular piles included in combined walls and high modulus walls can be filled with concrete. Composite structures such as Berliner walls and sheet pile walls in combination with shotcrete, are not covered by this document.
Begin
2019-06-14
WI
00288027
Planned document number
DIN EN 12063
Project number
00517567
Responsible national committee
NA 005-05-18 AA - Sheet pile wall structures
Responsible european committee
CEN/TC 288/WG 19 - Sheet-pile walls
draft standard
Execution of special geotechnical work - Sheet-pile walls, combined pile walls, high modulus walls; German and English version prEN 12063:2020
2020-07
Order from DIN Media
previous edition(s)
Execution of special geotechnical work - Sheet-pile walls; German version EN 12063:1999
1999-05