• Hydrogen Technologies Standards form the basic framework for market ramp-up

    More information
  • Climate change Standards and specifications support climate targets

    More information
  • Smart Farming Standards and specifications are drivers for the digitalization of agriculture

    More information
Standards [Withdrawn]

DIN 18312
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Underground construction work

Title (German)

VOB Vergabe- und Vertragsordnung für Bauleistungen - Teil C: Allgemeine Technische Vertragsbedingungen für Bauleistungen (ATV) - Untertagebauarbeiten

Overview

ATV DIN 18312 "Underground construction work" has been editorially revised by the German Committee for Construction Contract Procedures (DVA). Among other things, the references to VOB/A have been updated. This standard deals with the excavation and extraction of soil and rock, using sub-surface and cut-and-cover techniques, for the construction of underground cavities in soil and rock (such as adits, tunnels, caverns, shafts) which are not directly intended for the extraction of minerals. It includes the breaking, loading and haulage of soil and rock, the supporting of the cavity underground, and the collection, treatment and discharge of water up to the assigned discharge point. It also applies to supporting work in cases where this also serves to permanently line the cavities.

Document: references other documents

Document: referenced in other documents

Edition 2016-09
Original language German
Translation English
Price from 49.20 €
Table of contents

Contact

Heike Wemme

Am DIN-Platz, Burggrafenstr. 6
10787 Berlin

Tel.: +49 30 2601-2642
Fax: +49 30 2601-42642

Send message to contact