DIN CEN/TS 17006
; DIN SPEC 1035:2017-05
Earthworks - Continuous Compaction Control (CCC); German version CEN/TS 17006:2016
Erdarbeiten - Flächendeckende dynamische Verdichtungskontrolle (FDVK); Deutsche Fassung CEN/TS 17006:2016
Procedure
VN
Overview
This technical specification provides guidance, specifications and requirements on the use of Continuous Compaction Control (CCC) as a quality control method in earthworks by means of roller integrated dynamic measuring and documentation systems. The CCC method is suitable for soils, granular materials and rockfill materials which can be compacted using vibratory rollers. The responsible German standardization committee is Working Committee NA 005-05-22 AA "Erdarbeiten (SpA zu CEN/TC 396 und CEN/TC 396" ("Earthworks (national mirror committee for CEN/TC 396), Joint committee with FGSV), Gemeinschaftsausschuss mit FGSV)") at DIN Standards Committee Building and Civil Engineering (NaBau).
Responsible national committee
NA 005-05-22 AA - Earthworks (national mirror committee for CEN/TC 396), Joint committee with FGSV