Search results
Search list
Results in:
CLC/TC 64/WG 24
To be set up - Installations in agricultural and horticultural premises
CLC/TC 64/WG 03
To be set up - Earthing arrangements, protective conductors and protective bonding conductors
CLC/TC 64/WG 22
To be set up - Swimming pools and other basins rooms and cabins containing sauna heaters
IEC CIS/A/774/CD
CISPR 16-1-4 Amd. 2 f1 Ed. 2.0: Evaluation of set-up table in the frequency range above 1 GHz
IEC 77B/292/FDIS
Amendment to IEC 61000-4-2 - A test set-up for portable and/or double insulated table top equipment
IEC CIS/F/420/CD
CISPR 14-1 A1 f3 Ed.5: Alignment of disturbance power measurement set-up with CISPR 16-2-2
IEC 80/613/DC
Maintenance programme - Setting up of a Maintenance Team to prepare an Edition 2 of IEC 62065, Maritime navigation and radiocommunication equipment and systems - Track control systems - Operational and performance requirements, methods of testing and required test results
prEN 50491-5-1
General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 5-1: EMC requirements, conditions and test set-up
DIN CEN/TS 18078
Electronic fee collection - Measurement of interferences on tolling and tachograph devices from radio local area network devices operating in the 5,8 GHz frequency range - Test suite structure and test purposes; English version CEN/TS 18078:2024
DIN EN IEC 63044-5-1/A1
Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 5-1: EMC requirements, conditions and test set-up (IEC 23/878A/CD:2019); Text in German and English