Search results

Search list

Results in:

71-80 of 85 results

Eurocode 1 - Actions on structures - Part 1-7: Accidental actions

Fibre-optic communication subsystem test procedures - Part 4-2: Installed cable plant - Single-mode attenuation and optical return loss measurement (IEC 86C/1876/CDV:2023); German and English version prEN IEC 61280-4-2:2023

Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead contact lines on electrified roads

Railway applications - Call for aid and communication device - Requirements for heavy rail vehicles; German and English version prEN 16683:2023

Project

prEN 16683

Railway applications - Call for aid and communication device - Requirements for heavy rail vehicles

Energy performance of buildings - Controls for heating systems - Part 1: Control equipment for hot water heating systems - Modules M3-5, 6, 7, 8; German version EN 12098-1:2022

Energy performance of buildings - Controls for heating systems - Part 3: Control equipment for electrical heating systems - Modules M3-5,6,7,8; German version EN 12098-3:2022

Project

prEN 14198

Railway applications - Braking - Requirements for the brake system of trains hauled by locomotives

Railway applications - Braking - Requirements for the brake system of trains hauled by locomotives; German and English version prEN 14198:2023

Railway applications - Braking - Requirements for the brake system of trains hauled by locomotives

TOP