Search results
Search list
Results in:
IEC 78/348/NP
Live working - Guidelines for the installation and maintenance of optical cabling - Part 1: Overhead high voltage power supply lines
IEC 78/634/DTR
IEC TR 62263: Live working - Guidelines for the installation and maintenance of optical cabling on overhead power lines
IEC 78/865/DC
Review of IEC TR 62263 Ed.1: Live working - Guidelines for the installation and maintenance of optical fibre cables on overhead power lines
IEC 115/16A/NP
Comments received on 115/16/NP: Electromagnetic Environment Criterion for High-voltage Direct Current (HVDC) Overhead Transmission Lines
ISO/AWI 10245-5
Cranes - Limiting and indicating devices - Part 5: Overhead travelling and portal bridge cranes
IEC/CIS/B/WG 2
Interference from overhead power lines, high-voltage equipment and electric traction
IEC/TC 115/WG 3
Electromagnetic Environment Criterion for High-voltage Direct Current (HVDC) Overhead Transmission Lines
IEC/TC 9/AG SLG SG OCL
IEC UIC SLG Subgroup Overhead Contact Lines
IEC/TC 9/AHG 14
Copper and copper alloy messenger wires for overhead contact line/catenary systems
IEC/TC 9/MT 62486
Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead line (to achieve free access)