Search results

Search list

Results in:

1-10 of 88 results

Biotechnology - Biobanking - General requirements for (semi-)automated storage and retrieval equipment

Structural fire design for buildings (national mirror committee for CEN/TC 89 (partly), CEN/TC 89/WG 12 (partly), ISO/TC 163 (partly), ISO/TC 163/SC 2 (partly), ISO/TC 163/SC 2/WG 13)

Characteristic values and requirements (national mirror committee for CEN/TC 89/WG 12 (partly), ISO/TC 163/SC 1/WG 10, ISO/TC 163/SC 3/WG 4)

Heat transmission (national mirror committee for CEN/TC 89 (partly), CEN/TC 89/WG 12 (partly), ISO/TC 163 (teilweise), ISO/TC 163/SC 2/WG 9 (without transparent components))

Thermal insulation materials (national mirror committee for CEN/TC 88 and WG 1 to 9, WG 12 to 16, WG 19 to 23, ISO/TC 61/SC 10, ISO/TC 163 (partly), ISO/TC 163/SC 1 and SC 3 (partly))

Thermal insulation materials for building equipment and industrial installations (national mirror committee for CEN/TC 88/WG 10, ISO/TC 163/SC 1/WG 20 and ISO/TC 163/SC 3 (partly))

Metallic industrial piping - Part 6: Additional requirements for buried piping

Metallic industrial piping - Part 6: Additional requirements for buried piping

Amendment 3 to IEC 60364-6-61 Ed.1.0 - Electrical installations of buildings - Part 6-61: Verification - Initial verification

Amendment 3 to IEC 60364-6-61: Electrical installations of buildings - Part 6-61 : Verification - Initial verification

TOP