Search results
Search list
Results in:
NF C46-050-2-4 ; NF EN IEC 61326-2-4:2021-06-04
ctrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4 : particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9
Edition
2021-06-04
UNE-EN 13757-8
Communication systems for meters - Part 8: Adaptation layer
Edition
2024-04-24
FD C91-003-14 ; FD IEC/TR 61000-3-14:2022-09-07
Electromagnetic compatibility (EMC) - Part 3-14 : Assessment of emission limits for harmonics, interharmonics, voltage fluctuations and unbalance for the connection of disturbing installations to LV power systems
Edition
2022-09-07
BS EN 15869-3
Inland navigation vessels. Electrical shore connection, three phase current 400 V, 50 Hz, up to 125 A. On-board unit, additional requirements
Edition
2019-06-19
BS EN 15869-2
Inland navigation vessels. Electrical shore connection, three phase current 400 V, 50 Hz, up to 125 A. On-shore unit, additional requirements
Edition
2019-06-18
NF C91-003-12 ; NF EN 61000-3-12:2012-04-01
Electromagnetic compatibility (EMC) - Part 3-12 : limits - Limits for harmonic currents produced by equipment connected to public low-voltage systems with input current > 16 A and < or = 75 A per phase
Edition
2012-04-01
UNE-EN 61000-3-12
Electromagnetic compatibility (EMC) - Part 3-12: Limits - Limits for harmonic currents produced by equipment connected to public low-voltage systems with input current > 16 A and ≤ 75 A per phase
Edition
2012-07-18
NF C46-050-2-2 ; NF EN IEC 61326-2-2:2021-06-04
Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-2 : particular requirements - Test configurations, operational conditions and performance criteria for portable testing, measuring and monitoring equipment used in low-voltage distribution systems
Edition
2021-06-04
UNE-EN IEC 61326-2-2
Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-2: Particular requirements - Test configurations, operational conditions and performance criteria for portable testing, measuring and monitoring equipment used in low-voltage distribution systems (Endorsed by Asociación Española de Normalización in July of 2021.)
Edition
2021-07-01
NF C91-003-12/A1 ; NF EN 61000-3-12/A1:2024-04-26
Electromagnetic compatibility (EMC) - Part 3-12 : limits - Limits for harmonic currents produced by equipment connected to public low-voltage systems with input current more than16 A and less than or equal to 75 A per phase
Edition
2024-04-26