Search results

Search list

Results in:

51-60 of 65 results
Standards [CURRENT]

UNE-EN ISO 13503-2

Petroleum and natural gas industries - Completion fluids and materials - Part 2: Measurement of properties of proppants used in hydraulic fracturing and gravel-packing operations (ISO 13503-2:2006) (Endorsed by AENOR in January of 2007.)
Edition 2007-01-01

Standards [CURRENT]

UNE-EN ISO 13503-4

Petroleum and natural gas industries - Completion fluids and materials - Part 4: Procedure for measuring stimulation and gravel-pack fluid leakoff under static conditions (ISO 13503-4:2006) (Endorsed by AENOR in January of 2007.)
Edition 2007-01-01

Standards [CURRENT]

UNE-EN ISO 13503-2/A1

Petroleum and natural gas industries - Completion fluids and materials - Part 2: Measurement of properties of proppants used in hydraulic fracturing and gravel-packing operations - Amendment 1: Addition of Annex B: Proppand specification (ISO 13503-2:2006/Amd 1:2009) (Endorsed by AENOR in December of 2009.)
Edition 2009-12-01

 
Edition 2011-03-28

Standards [CURRENT]

ABNT NBR ISO 13503-2

Petroleum and natural gas industries - Completion fluids and materials Part 2: Measurement of properties of proppants used in hidraulic fracturing and gravel-packing operations
Edition 2011-03-28

Standards [CURRENT]

OENORM EN ISO 13503-4

Petroleum and natural gas industries - Completion fluids and materials - Part 4: Procedure for measuring stimulation and gravel-pack fluid leakoff under static conditions (ISO 13503-4:2006)
Edition 2007-03-01

Standards [CURRENT]

UNE-EN ISO 13503-5

Petroleum and natural gas industries - Completion fluids and materials - Part 5: Procedures for measuring the long-term conductivity of proppants (ISO 13503-5:2006) (Endorsed by AENOR in September of 2006.)
Edition 2006-09-01

Standards [CURRENT]

OENORM EN ISO 13503-5

Petroleum and natural gas industries - Completion fluids and materials - Part 5: Procedures for measuring the long-term conductivity of proppants (ISO 13503-5:2006)
Edition 2007-03-01

Technical rule [CURRENT]

API RP 13M-6

Procedure for Measuring Leakoff of Completion Fluids Under Dynamic Conditions
Edition 2020-05

Petroleum and natural gas industries - Design and operation of subsea production systems - Part 7: completion/workover riser systems
Edition 2009-12-01

Related searches

Choose a keyword to learn more:
TOP