Search results
Search list
Results in:
PR NF E51-775-3 ; PR NF EN 16798-3
Energy performance of buildings - Ventilation for buildings - Part 3: For non-residential buildings - Performance requirements for ventilation and room-conditioning systems (Modules M5-1, M5-4)
PR NF E38-116-3/A1 ; PR NF EN 14511-3/A1
Air conditioners, liquid chilling packages and heat pumps for space heating and cooling and process chillers, with electrically driven compressors - Part 3: Test methods
PR NF E38-116-2/A1 ; PR NF EN 14511-2/A1
Air conditioners, liquid chilling packages and heat pumps for space heating and cooling and process chillers, with electrically driven compressors - Part 2: Test conditions
15/30328753 DC
BS EN 14511-1. Air conditioners, liquid chilling packages and heat pumps for space heating and cooling and process chillers using electrically driven compressors. Part 1. Terms and definitions
Edition
2015-10-08
ONR CEN ISO/TR 52003-2
Energy performance of buildings - Indicators, requirements, ratings and certificates - Part 2: Explanation and justification of ISO 52003-1 (ISO/TR 52003-2:2017)
Edition
2017-11-15
ONR CEN/TR 12831-2
Energy performance of buildings - Method for calculation of the design heat load - Part 2: Explanation and justification of EN 12831-1, Module M3-3
Edition
2017-12-01
ONR CEN/TR 16798-6
Energy performance of buildings - Ventilation for buildings - Part 6: Interpretation of the requirements in EN 16798-5 -1 and EN 16798-5-2 - Calculation methods for energy requirements of ventilation and air conditioning systems (Modules M5-6, M5-8, M 6-5, M6-8, M7-5, M7-8) (CEN/TR 16798-6:2017)
Edition
2018-01-01
ISO 18566-1
Building environment design - Design, test methods and control of hydronic radiant heating and cooling panel systems - Part 1: Vocabulary, symbols, technical specifications and requirements
Edition
2017-06
PR NF E17-901-3 ; PR NF EN 13757-3
Communication systems for and remote reading of meters - Part 3 : dedicated application layer.
PR NF P52-721-6 ; PR NF EN ISO 16484-6
Building automation and control systems (BACS) - Part 6 : data communication conformance testing.