Search results

Search list

Results in:

171-180 of 16,499 results
Standards [CURRENT]

OEVE/OENORM EN 61391-2

Ultrasonics - Pulse-echo scanners - Part 2: Measurement of maximum depth of penetration and local dynamic range (IEC 61391-2:2010) (german version)
Edition 2010-11-01

Standards [CURRENT]

OENORM Z 1516

Mobile ladders with platform carrying loads of more than 150 kg and up to maximum 500 kg to be used by one or more persons - Functional dimensions, testing, marking of conformity
Edition 1994-03-01

Standards [CURRENT]

OENORM EN ISO 11592-2

Small craft - Determination of maximum propulsion power rating using manoeuvring speed - Part 2: Craft with a length of hull between 8 m and 24 m (ISO 11592-2:2021)
Edition 2022-01-01

Standards [CURRENT]

SN EN 16556

Determination of the maximum open time for thermoplastic wood adhesives for non-structural applications
Edition 2015-01

Standards [CURRENT]

SN EN 60806

Determination of the maximum symmetrical radiation field from a rotating anode X-ray tube for medical diagnosis
Edition 2004-06

Standards [CURRENT]

SN EN 1594

Gas infrastructure - Pipelines for maximum operating pressure over 16 bar - Functional requirements
Edition 2024-03

Standards [CURRENT]

OEVE/OENORM EN 50332-1

Sound system equipment: Headphones and earphones associated with personal music players - Maximum sound pressure level measurement methodology - Part 1: General method for "one package equipment" (german version)
Edition 2014-10-01

Standards [CURRENT]

OEVE/OENORM EN 61280-2-1

Fibre optic communication subsystem test procedures - Part 2-1: Digital systems - Receiver sensitivity and overload measurement (IEC 61280-2-1:2010) (german version)
Edition 2011-03-01

Standards [CURRENT]

OEVE/OENORM EN 60191-6-19

Mechanical standardization of semiconductor devices - Part 6-19: Measurement methods of the package warpage at elevated temperature and the maximum permissible warpage (IEC 60191-6-19:2010) (german version)
Edition 2010-11-01

Standards [CURRENT]

OENORM EN 303-4

Heating boilers - Part 4: Heating boilers with forced draught burners - Special requirements for boilers with forced draught oil burners with outputs up to 70 kW and a maximum operating pressure of 3 bar - Terminology, special requirements, testing and marking
Edition 1999-04-01

TOP