DIN EN 12953-6
Shell boilers - Part 6: Requirements for equipment for the boiler
Großwasserraumkessel - Teil 6: Anforderungen an die Ausrüstung für den Kessel
Brief description
This document specifies the minimum requirements for safety related equipment for shell boilers (generator and/or assemblies) as specified in EN 12953-1:2012, to ensure the boiler operates within the allowable limits (pressure, temperature, etc.) and if the limits are exceeded the energy supply shall be automatically interrupted and locked out, irrespective of the degree of intervention. NOTE 1 For this European Standard, the term "boiler" is applicable for generator and/or assemblies. NOTE 2 The maximum time of operation without manual (human) intervention can be specified for each boiler system. NOTE 3 Annex C (informative) gives recommendations of operation and testing of the boiler system with a maximum time of operation without manual (human) intervention of 24 hours and 72 hours.