NA 043

DIN Standards Committee Information Technology and IT Applications

Project

Postal services - Harmonized track and trace events - Part 1: Forward flow; German version CEN/TS 18055-1:2024

Abstract

The scope of this technical specification is the forward flow of E-Commerce items. Starting point is arrival at a logistic service provider, end point is the final delivery, or at least the attempt to final delivery. The returns flows, either caused by unsuccessful delivery, “return to sender” or as a service for recipients to send a received shipment back, are not covered by the forward events. To keep this technical specification unambiguous and easy to understand, these return flows are excluded. Return flows may be covered in a separate technical specification. Not in scope are the logistical flows within the facilities of the producers and sellers of the items. These fall outside the responsibility of the CEN/TC 331 domain. Excluded as well, are all events necessary for an LSP to track items within its own facilities. It is up to the LSP how to run its business, and internal standards are in place for the management of internal processes. Internal events are considered to be of no interest to a recipient, with the exception of some of the last mile events which are mentioned later in this document.

Begin

2023-06-19

WI

00331132

Planned document number

DIN CEN/TS 18055-1

Project number

04301076

Contact

Boris Reznicek

Am DIN-Platz, Burggrafenstr. 6
10787 Berlin

Tel.: +49 30 2601-2327
Fax: +49 30 2601-42327

Send message to contact