Pumping stations - design, construction and operation

Abstract

This standard specifies the planning, construction and operation of pumping stations that ensure the permanent or temporary discharge from flowing or standing surface waters that temporarily or permanently lack a natural discharge. A distinction is made between permanent pumping stations and flood pumping stations. Permanent pumping stations convey the entire discharge from an area that has no natural receiving water. Floodwater pumping stations only pump during periods when the natural receiving water is insufficient. This standard does not apply to sewage pumping stations, sludge pumping stations, pumping stations for water extraction or supply and the like.

Begin

2024-08-26

Planned document number

DIN 1184

Project number

11905013

Responsible national committee

NA 119-02-10 AA - Pumping station  

previous edition(s)

Pumping stations; archimedian screw pumps; directives for planning
1992-03

Order from DIN Media

Pumping stations; centrifugal pumps for operation without screen; directives for planning
1992-03

Order from DIN Media

Pumping stations; centrifugal pumps for operation with screen; directives for planning
1992-03

Order from DIN Media

Pumping stations; design, construction and operation
1992-03

Order from DIN Media

Contact

Ralph Dominik

Am DIN-Platz, Burggrafenstr. 6
10787 Berlin

Tel.: +49 30 2601-2570
Fax: +49 30 2601-42570

Send message to contact