NA 082

DIN Standards Committee Piping and Boiler Plant

Project

Shell Boilers - Part 6: Requirements for equipment for the boiler

Abstract

This part of this European Standard specifies the minimum requirements for safety related equipment for shell boilers as defined in EN 12953-1, to ensure the boiler operates within the allowable limits (pressure, temperature, etc.) and if the limits are exceeded the energy supply shall be interrupted and locked out without manual (human) intervention at the boiler. NOTE 1 The maximum time of operation without manual (human) intervention should be defined for each boiler system. NOTE 2 Annex C (informative) gives recommendations of operation and testing of the boiler system with a maximum time of operation without manual (human) intervention of 72 hours.

Begin

2021-11-15

WI

00269067

Planned document number

EN 12953-6

Responsible national committee

NA 082-00-18 AA - Boiler plants  

Responsible european committee

CEN/TC 269/WG 2 - Shell boilers  

draft standard

Shell Boilers - Part 6: Requirements for equipment for the boiler
2023-06
Order from DIN Media

Shell Boilers - Part 6: Requirements for equipment for the boiler
2024-07
Order from DIN Media

previous edition(s)

Shell Boilers - Part 6: Requirements for equipment for the boiler
2011-02

Order from DIN Media

Contact

Dipl.-Wi.-Ing. (FH)

Thomas Schreiber

Am DIN-Platz, Burggrafenstr. 6
10787 Berlin

Tel.: +49 30 2601-2147
Fax: +49 30 2601-2147

Send message to contact