NA 087

DIN Standards Committee Railway

Project

Railway applications - Gauges - Part 2: Rolling Stock

Abstract

This document is applicable to new vehicle designs, to modifications to existing vehicles and for checking existing vehicles to be used on another route or network. This document contains: - the rules for rolling stock for all defined gauges; - the swept envelope calculation process used for defined dynamic gauges, absolute and comparative process; - the list of documents required to assess vehicle conformity to this standard. This document is applicable to heavy rail vehicles using various track gauges. Other vehicles and networks are outside the scope of this document, but the rules may be applied to them with some adjustments and agreement of the share of responsibility between rolling stock and infrastructure. Other vehicles are outside the scope of this document, but the rules may be applied to them. This document is not applicable to the gauges “S” and “T” for track gauge 1 520 mm.

Begin

2022-02-17

WI

00256A0N

Planned document number

prEN 15273-2

Responsible national committee

NA 087-00-06 AA - Gauges  

Responsible european committee

CEN/TC 256/SC 4/WG 32 - Gauges  

draft standard

Railway applications - Gauges - Part 2: Rolling Stock
2023-03
Order from DIN Media

previous edition(s)

Railway applications - Gauges - Part 2: Rolling stock gauge
2016-11

Order from DIN Media

Contact

Dipl.-Ing.

Bärbel Blaschke

Rolandstr. 4
34131 Kassel

Send message to contact