NA 087

DIN Standards Committee Railway

Project

Railway applications - Aerodynamics - Part 6: Requirements and test procedures for cross wind assessment

Abstract

This document gives guidelines for the cross wind assessment of railways. This document is applicable to all passenger vehicles, locomotives and power cars (with a maximum train speed above 140 km/h up to 360 km/h) and freight wagons (with a maximum train speed above 80 km/h up to 160 km/h) and track gauges from 1 435 mm to 1 668 mm inclusive. For passenger vehicles, locomotives and power cars with a maximum train speed between 250 km/h and 360 km/h, a requirement to demonstrate the cross wind stability is imposed. This document is not applicable to light rail and urban rail vehicles.

Begin

2020-04-28

WI

00256A03

Planned document number

EN 14067-6/FprA1

Responsible national committee

NA 087-00-05 AA - Aerodynamics  

Responsible european committee

CEN/TC 256/SC 4/WG 6 - Aerodynamics  

draft standard

Railway applications - Aerodynamics - Part 6: Requirements and test procedures for cross wind assessment
2020-08
Order from DIN Media

Railway applications - Aerodynamics - Part 6: Requirements and test procedures for cross wind assessment
2022-03
Order from DIN Media

Contact

Kirsten Meyer-Stahl

Rolandstr. 4
34131 Kassel

Send message to contact