NA 031

DIN Standards Committee Firefighting and Fire Protection

Project

Delivery valve installations - Part 2: Filling station and output system connected with dry water conduit for fire extinguishing

Abstract

This document contains requirements for filling station and output system connected with dry water conduit for fire extinguishing as well as the dimensions and specifications. Information for planners, plant manufacturers and operators is also included. The requirements of DIN 14462 shall always be considered for the planning, construction and operation of extinguishing water systems as well as for the installation of filling station and output system.

Begin

2024-07-19

Planned document number

DIN 14461-2

Project number

03101479

Responsible national committee

NA 031-03-05 AA - Systems to supply water for fire fighting - mirror committee of CEN/TC 191/WG 9  

previous edition(s)

Delivery valve installations - Part 2: Filling station and output system connected with dry water conduit for fire extinguishing
2009-09

Order from DIN Media