Control systems in the process industry - Electrical and instrumentation loop check

Abstract

Defines procedures and specifications for the Factory Acceptance Test (FAT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification.

Begin

2024-08-20

Planned document number

DIN EN IEC 62382

Project number

02232519

Responsible national committee

DKE/K 941 - Engineering  